1 General ………………………………………………………………… (1)
2 Definitions ……………………………………………………………… (2)
3 Site selection for jetty ………………………………………………… (3)
4 Operation conditions …………………………………………………… (4)
4. 1 General ……………………………………………………………… (4)
4. 2 Operation conditions ……………………………………………… (4)
5 Layout design …………………………………………………………… (6)
5. 1 General ……………………………………………………………… (6)
5. 2 Water area of the jetty ……………………………………………… (6)
5. 3 Berth layout ………………………………………………………… (7)
5. 4 Jetty ………………………………………………………………… (7)
5. 5 Breakwater and revetment ………………………………………… (8)
5. 6 Approach channel ………………………………………………… (10)
5. 7 Anchorage area …………………………………………………… (10)
5. 8 Tugboats …………………………………………………………… (10)
6 Berth capacity ………………………………………………………… (12)
7 Maritime structures …………………………………………………… (13)
7. 1 Safety classe of structure and seismic precautionary criterion …… (13)
7. 2 Calculation value of external load action ………………………… (13)
7. 3 Structure deformation ……………………………………………… (14)
7. 4 Revetment at tank farm area ……………………………………… (14)
8 Land formation and ground improvement of the receiving
terminal ……………………………………………………………… (15)
9 Safety facilities of the LNG jetty …………………………………… (16)
9. 1 General facilities ………………………………………………… (16)
9. 2 Fire fighting facilities ……………………………………………… (16)
9. 3 Communication and navigation aid facilities ……………………… (19)
9. 4 Auxiliary facilities ………………………………………………… (19)
Annex A Explanation of words and expressions ……………………… (20)
Additional notes …………………………………………………………… (21)